[Geysers] Geyser reports 4/23-25/09
Bill Warnock
billwarnock at wyellowstone.com
Sat Apr 25 20:00:43 PDT 2009
Further reports from cool YNP:
4/23/09
Grand 2337 (4/22) E 0626 E 1422 T2C
Plume 0647 0842 0940 1224 1409 1553
Riverside 1300 ie
Daisy 1339
Beehive 1630 Indicator 1620
4/24/09 (all from OFVC log since I wasn't in Park)
Castle 0904E maj 2036E maj
Daisy 1100
Grand 0525E 1251 web 2100E
Beehive 0918 ie
Lion 1124 ie 1250
4/25/09 (Steve Eide arrived late last night and is here for a week; he's responsible for early reports before 10 am)
Daisy 0748 ie 1155
Riverside 0728 1400
Grotto 0711 ie
Plume 0835 0937 1046 1142 1333 1432
Depression 0813 ie
Little Squirt 0822 ie
Grand 0529E 1302 G2Q
Lion 1212 init. 1339 1508 minor
Castle 1222 major
Artemesia 1259 ie
West Triplet 1311
Beehive 1605
As I left Park at 1530 at Lower Basin, a woman was off boardwark on the edge of Celestine Pool taking pictures. I shouted at her she should not be in that area. Then three of her companions emerged above Silex and jeered at me. I told them they were there illegally. The parking lot entrance is barred by yellow tape, saw-horses, signs saying boardwalk reconstruction underway, and finally Bear Management Closure. Part of the boardwalk is torn up. Does Bear Closure not apply to poor construction workers? As I continued over the rise, there were a van and two other vehicles with people again wandering around Leather Pool and up on to the boardwalk by the Paintpots...again evidence of the silliness of the closure of Lower Basin to all but construction workers. This the THIRD time I've seen the same situation. I called the OFVC to report the situation. I've got an appointment to speak with a senior Park official on Tuesday morning on this issue. Will keep you apprised. We have more snow predicted for tomorrow, so will not go in again until Monday.
-------------- next part --------------
An HTML attachment was scrubbed...
URL: </geyser-list/attachments/20090425/e9f4e037/attachment.html>
More information about the Geysers
mailing list