[Geysers] Belated post of Old Faithful planning issues (from 4th of July meeting)
Ralph Taylor
ralpht at iglou.com
Thu Oct 28 16:59:57 PDT 2004
>From Ralph Taylor 28 October 2004
At the NPS-Geyser Gazer meeting on 6 July Craig McClure read a list of
planning issues that are being worked on for the Old Faithful area. We said
that the list would be posted "soon", which I suppose is now! For a variety
of reasons, it took a while to get the document into a form we could read,
(it was a Mac document), and then when I finally received it I was packing
to leave Yellowstone. Anyway, for what it is worth, here it is, courtesy of
Craig McClure. I hope the formatting is not too jumbled to read. The
project name is at the left, followed by a brief description of the scope,
the date the planning is to be completed, and the department and person
responsible.
Ralph Taylor 28 October 2004
Old Faithful Projects:
Project: Scope/Timeframe/Division-Project Lead
Old Faithful Comprehensive Plan Comprehensive plan for the area/2004/
Planning and Compliance/Landscape Arch
(PCLA)-Eleanor Clark
Old Faithful Visitor Center New visitor center in the location of the
existing VC/ 2006/
Interp-D. Chalfant
Old Faithful VC Landscape Designing the landscape features
surrounding the new VC/ 2004/
Maya Lin/Van Vallenburgh/ Interp/ D.
Chalfant and E. Clark
Old Faithful VC Exhibit Plan IDIQ design for exhibits and paths in the
area near the VC/2004/
Interp-Chalfant and PCLA-E. Clark
Old Faithful Inn Old House Repair structure and restore old
house/2005/
Maintenance-P. Galindo
O.F. Cultural Landscape Inventory IDIQ CLI for the developed
area/2004/PCLA-Z. Osman
O.F. Circulation Study DSC IDIQ circulation study and EA for
pedestrian/vehicle circulation/
PCLA-D. Madsen
Old Faithful road Engineering Study FHWA/NPS study of road
issues/2006/Maintenance- N. Ward
Old Faithful FLHP project Reconstruct the roads in the area,
including the interchange/2007/
Maint and PCLA
Relocate/Repair Photo Shop Move and restore the interior of the photo
shop for new use/2004/
Maint-S. Iobst
Move/Repair Photo Cabin Move cabin for alternative
use/2004/Maint/YI-S. Iobst
Old Faithful Cell Tower Cell tower project needed to determine
final tower height/2004/
PCLA-Madsen and Admin-J. Timmins
Old Faithful Contractor Camp Develop a contractor camp in the disturbed
area left by the old
sewer plant/ 2004/Maint- N. Ward
Old Faithful Water Line Replace water line/??
Old Faithful Settling Ponds Settling ponds on Craig Pass/ 2004/Maint.
-N. Ward
Old Faithful Warming Hut Site and build new warming hut/?/Bus. Mgmt
- M. Murphy
Old Faithful Night Lighting Evaluate and replace lighting which is not
night sky effective/
YPF grant/National Trust grant/2004/PCLA-L.
Chan
O.F. Component of Commercial Services Commercial services plan for park
concessions operations/?/
PCLA-E. Clark